Description : First stage of a two-stage semi-industrial complex (Anderlecht I & Anderlecht II), located south-west of Brussels, not far from Boulevard Paepsem, Boulevard de l'Humanité & the Brussels outer ring road - junction 17 Anderlecht-Industrie.
Technicalities : Offices : kitchenette, lighting, mineral fibre false ceilings with recessed luminaries, wall-to-wall floor covering, toilets, aluminium window frames with single glazing and outside sun blinds, air conditionning in some offices, central heating. Warehouses: load tolerance (3t/m²), overhead clearance (6m), access through sectional doors, façade of prefabricated concrete materials covered with metal cladding panels, TL-tube lighting and skylights, oil-fired boiler with unit heaters.
Year of construction/renovation :1976
Total space : 7797 m²
Architect(s) :P.L. Hanotte
Access : Within reach of the outer ring road (RO), exit Anderlecht-industrie N17 and 4 km from the Midi train station (TGV-Eurostar-Thalys). Access to different bus services.